AUREX
Active 5-Axis CNC Milling Machinery & Factory Floor
AUREX INDUSTRIAL PLATFORM
PRECISION MANUFACTURING & ENGINEERING

PRECISION ENGINEERED.
BUILT FOR INDUSTRY.

Advanced manufacturing solutions for demanding industries worldwide. From 5-axis CNC machining to 12,000-ton forging and sub-micron quality inspection.

LIVE PRODUCTION CELLActive
Active CNC Spindle
Cell 04 • Hermle C62 5-AxisInconel 718 Turbofan Stator
TOLERANCE±0.0018 mm
FEED RATE18,500 mm/min
25+
Years Experience
Precision engineering heritage
18+
Countries Served
Global OEM distribution
120K+
Sq. Ft. Facility
Advanced machine shop
120+
Engineered Solutions
Aerospace, Energy, Auto
01. EXECUTIVE THESIS & PRECISION PHILOSOPHY

ARCHITECTS OF HEAVY PRECISION &
Sub-Micron Industrial Metallurgy

“Where conventional fabrication meets its physical limits, Aurex operates at molecular tolerances.”

— Aurex Metallurgy Directorate, Zurich
Automated 5-Axis Portal Milling Plant
Facility Cell 04 • Zurich
Climate-Stabilized Continuous Machining Plant
48 Synchronized Spindles | ±0.0018mm Active Deviation Control
Executive Summary

Monolithic Integrity for Extreme Environments

Founded on Swiss precision manufacturing principles, AUREX INDUSTRIES engineers components that operate inside commercial turbofans at 1,400°C, offshore subsea wells at 20,000 PSI, and extreme ultraviolet vacuum steppers.

Monolithic Fabrication

Consolidating multi-part bolted assemblies into single forged or additively grown monoliths to eliminate stress concentrations and fatigue points.

Active Thermal Metrology

All finishing and CMM verification occurs in 20.0°C ±0.1°C vaults with Zeiss Xenos optical/tactile sensors calibrated to NIST standards.

Traceable Metallurgy

Complete melt-source traceability with 36-element optical emission spectrometry (OES) and Level III Non-Destructive Testing.

02. COMPANY STORY & MANUFACTURING HERITAGE

FOUR DECADES OF PRECISION EVOLUTION &
METALLURGICAL MASTERY

From our founding toolshop in Zurich to a multi-continental precision manufacturing powerhouse, Aurex has spent over 40 years continually redefining what is technically possible in high-stress metallurgy.

ERA 1984📍 Zurich, Switzerland

Precision Tooling & Swiss Metrology Roots

Established as an ultra-precision tool & die machining shop supplying Swiss watchmaking and aerospace hydraulic systems.

Engineering Breakthrough
Achieved DIN ISO 2768-f sub-5μm tolerance in hardened tool steel tooling.
Historic Impact Metric:
1st AS9100 Ancestor Certification
Precision Tooling & Swiss Metrology Roots
Aurex Technical Archives • Facility Node Zurich, Switzerland
Active CNC Machinery
OUR CAPABILITIES

ADVANCED MANUFACTURING CAPABILITIES

Full-spectrum precision manufacturing across multi-axis machining, heavy forging, robotic welding, and sub-micron CMM metrology.

CNC Machining
±0.0018 mm

CNC Machining

High-speed 5-axis synchronous milling for complex prismatic parts up to 4,200 mm.

Tolerance:DIN ISO 2768-f
Capacity:4,200 kg pallet
CNC Turning
Ø 1,200 mm

CNC Turning

Heavy-duty multi-spindle live tooling lathes for precision shafts, flanges, and rings.

Tolerance:ISO h6
Capacity:3,500 mm length
Fiber Laser & Waterjet Cutting
20 kW Fiber

Fiber Laser & Waterjet Cutting

High-power 20kW fiber laser and 6,000 bar abrasive waterjet profiling.

Tolerance:DIN EN ISO 9013 Class 1
Capacity:6,000 × 2,500 mm bed
Metal Fabrication & Forging
1,000 Metric Tons

Metal Fabrication & Forging

Heavy hydraulic press braking, seamless rolling, and 12,000-ton forging lines.

Tolerance:ISO 13920 Class A
Capacity:28,000 kg single forging
Robotic & Manual Welding
6,200 mm

Robotic & Manual Welding

7-axis robotic TIG, laser-hybrid, and certified ASME/AWS manual welding.

Tolerance:AWS D1.1
Capacity:15,000 kg weld positioner
Surface Finishing & Heat Treatment
Down to Ra 0.05 μm

Surface Finishing & Heat Treatment

Precision cylindrical grinding, vacuum heat treatment, and passivation.

Tolerance:AMS 2750G Class 1 (±3°C)
Capacity:8,500 kg batch furnace
Mechanical & Sub-Assembly
45,000 Sq. Ft.

Mechanical & Sub-Assembly

Full electromechanical assembly, bearing pressing, and hydraulic testing.

Tolerance:AS9100
Capacity:Complete turnkey skids up to 40,000 kg
CMM & Quality Inspection
0.3 μm + L/1000

CMM & Quality Inspection

Class 10,000 Zeiss metrology labs with tactile, optical, and 3D CT scanning.

Tolerance:Sub-micron inspection to 0.0001 mm
Capacity:4,000 × 2,500 × 2,000 mm CMM volume
Automated Robotic Welding
OUR PROCESS • PRECISION IN MOTION

HOW WE MANUFACTURE

A 10-stage closed-loop manufacturing pipeline ensuring sub-micron dimensional accuracy, zero metallurgical inclusions, and serialized traceability.

Raw Material Sourcing & Spectroscopy
01

Raw Material Sourcing & Spectroscopy

Ingots and plates are inspected via Optical Emission Spectrometry (OES) and ultrasonic scans to verify 36 chemical elements before release.

12 – 24 HoursStage 1 of 10
5-Axis CNC Milling
02

5-Axis CNC Milling

Machining inside enclosed cells with liquid-chilled spindles, hydrostatic ways, and 140 bar through-spindle coolant holding ±0.0018 mm.

18 – 72 HoursStage 2 of 10
Precision CNC Turning
03

Precision CNC Turning

Twin-spindle CNC lathes with driven tools perform synchronous turning, deep-hole boring, and milling with ±0.002 mm concentricity.

8 – 24 HoursStage 3 of 10
Fiber Laser & Waterjet Cutting
04

Fiber Laser & Waterjet Cutting

Precision contour cutting of thick alloy plates up to 50 mm with ultra-clean edges and zero distortion.

4 – 12 HoursStage 4 of 10
Heavy Fabrication & Forging
05

Heavy Fabrication & Forging

Continuous grain-flow closed-die forging and CNC press brake bending up to 1,000 tons for maximum structural integrity.

24 – 48 HoursStage 5 of 10
Robotic & Manual Welding
06

Robotic & Manual Welding

Closed-loop weld pyrometry and laser seam tracking delivering zero-defect full-penetration joints on pressure vessels.

12 – 36 HoursStage 6 of 10
Thermal Treatment & Surface Finishing
07

Thermal Treatment & Surface Finishing

Computer-controlled vacuum furnace cycles with multi-bar nitrogen gas quenching, cylindrical grinding to Ra 0.05 μm, and plating.

16 – 36 HoursStage 7 of 10
Zeiss CMM & Quality Inspection
08

Zeiss CMM & Quality Inspection

Ultra-precision Zeiss Xenos tactile CMMs and GOM optical 3D scanners capture millions of points for GD&T certification.

4 – 12 HoursStage 8 of 10
Cleanroom Assembly & Proof Testing
09

Cleanroom Assembly & Proof Testing

Parts are assembled in Class 10,000 cleanrooms with calibrated digital torque wrenches and proof pressure tested up to 30,000 PSI.

8 – 24 HoursStage 9 of 10
Hermetic Packaging & Global Delivery
10

Hermetic Packaging & Global Delivery

Components are ultrasonic solvent cleaned, nitrogen purged, sealed in mil-spec vacuum barrier foil, and dispatched worldwide.

Same-Day DispatchStage 10 of 10
Raw Material Sourcing & Spectroscopy
STEP 01AMS 2355 / ASTM A388

Raw Material Sourcing & Spectroscopy

Ingots and plates are inspected via Optical Emission Spectrometry (OES) and ultrasonic scans to verify 36 chemical elements before release.

OES Chemical Verification (36 Elements)
Ultrasonic C-Scan
ASTM E112 Grain Size Analysis
ENGINEERED COMPONENTS & ASSEMBLIES

MANUFACTURED PRODUCTS CATALOG

Standard and custom-engineered industrial components machined, forged, and assembled to exact customer specifications.

Precision Helical & Planetary Gear Assembly
Gears & Power Transmission
Tol: DIN 3962 Quality Class 4 / ±0.003 mm

Precision Helical & Planetary Gear Assembly

Ground tooth profile helical gear set engineered for high-torque industrial gearboxes and mining drives with whisper-quiet meshing.

Material:Case-Hardened Alloy Steel 18CrNiMo7-6
Application:Heavy Industrial Gearboxes, Mining Drives & Robotics
Lead Time:3 – 4 Weeks
Industrial High-Pressure Valve Body & Spool
Industrial Valve Components
Tol: ±0.004 mm Bore Roundness

Industrial High-Pressure Valve Body & Spool

Forged solid-block valve body with honed internal spools designed for 10,000 PSI corrosive oil & gas fluid control.

Material:Forged Stainless Steel 316L / Super Duplex
Application:Petrochemical Refineries, Subsea & Chemical Processing
Lead Time:4 – 5 Weeks
Hard-Chromed Hydraulic Piston & Cylinder Shaft
Hydraulic Components
Tol: ISO f7 / ±0.005 mm

Hard-Chromed Hydraulic Piston & Cylinder Shaft

Induction-hardened hydraulic cylinder rod with mirror-smooth hard chrome plating for 1,000-hour salt spray corrosion resistance.

Material:High-Tensile 42CrMo4 / AISI 4140
Application:Construction Excavators, Mobile Cranes & Marine Hydraulics
Lead Time:2 – 3 Weeks
Automotive Multi-Link Suspension Knuckle & Hub
Automotive & EV Components
Tol: ±0.008 mm Bearing Bore

Automotive Multi-Link Suspension Knuckle & Hub

Lightweight forged suspension upright designed for extreme cornering loads and integrated hub-bearing assemblies.

Material:Forged Aluminum 6082-T6 / High-Strength Ductile Iron
Application:Passenger Vehicles, High-Performance EV Platforms & Light Trucks
Lead Time:3 – 4 Weeks
Heavy CNC Structural Mounting Bracket & Flange
Structural & Fabrication Assemblies
Tol: ±0.015 mm Hole Centers

Heavy CNC Structural Mounting Bracket & Flange

Laser-cut and CNC-formed heavy duty equipment bracket with multi-axis machined locating pins for structural machinery.

Material:High-Strength Structural Steel S355J2 / Stainless 304
Application:Industrial Automation Frames, Power Plant Mounting & Rail Systems
Lead Time:2 – 3 Weeks
5-Axis Monolithic Aerospace Impeller & Blisk
CNC Machined Monolithic Components
Tol: ±0.002 mm Airfoil Profile

5-Axis Monolithic Aerospace Impeller & Blisk

Integral single-piece blisk milled from a solid titanium billet, eliminating blade roots and maximizing gas flow aerodynamics.

Material:Titanium Ti-6Al-4V Grade 5 / Inconel 718
Application:Aerospace Turbofans, Microturbines & High-Flow Turbochargers
Lead Time:5 – 6 Weeks
Heavy Agricultural Drive Spindle & Hub Assembly
Agricultural Equipment Parts
Tol: ±0.008 mm Spline Pitch

Heavy Agricultural Drive Spindle & Hub Assembly

Extreme shock-resistant drive shaft and hub assembly engineered for large combine harvesters and high-horsepower tractors.

Material:Forged Alloy Steel 4140 + Hardened Sleeves
Application:Heavy Tractors, Combine Harvesters & Soil Preparation Machinery
Lead Time:3 – 4 Weeks
Custom OEM Machined Casting & Forging Enclosure
Custom OEM Components
Tol: ±0.006 mm Dowel Interfaces

Custom OEM Machined Casting & Forging Enclosure

Turnkey CNC finish-machined heavy machinery housing with integrated bearing pockets, o-ring grooves, and pressure oil galleries.

Material:Ductile Iron EN-GJS-500-7 / Cast Steel WCB
Application:Custom OEM Industrial Equipment, Compressors & Pumps
Lead Time:4 – 6 Weeks
Self-Lubricating Bronze & Maraging Steel Bushings
Industrial Components
Tol: ISO H7 / ±0.003 mm

Self-Lubricating Bronze & Maraging Steel Bushings

Maintenance-free self-lubricating wear sleeves with solid graphite plugs engineered for high-load, low-speed pivot joints.

Material:Aluminum Bronze CuAl10Ni5Fe4 / Maraging 300
Application:Hydraulic Excavator Pivot Pins, Marine Rudders & Press Guides
Lead Time:1 – 2 Weeks
20,000 PSI Deepwater HPHT Manifold Block
Offshore & Deepwater Energy
Tol: ±0.005 mm

20,000 PSI Deepwater HPHT Manifold Block

Forged solid block deep-sea distribution manifold with internal high-pressure fluid galleries for 3,000m subsea wells.

Material:Super Duplex UNS S32750 / F53
Application:Subsea Wellhead Gathering & Chemical Injection System
Lead Time:8 – 10 Weeks
EUV Lithography 0.1nm Vacuum Process Chamber
Semiconductor Tooling
Tol: ±0.0015 mm

EUV Lithography 0.1nm Vacuum Process Chamber

Ultra-high vacuum process chamber with mirror-electropolished interior (Ra 0.05 μm) and internal cooling water jackets.

Material:Aluminum 6061-T651 / VIM-VAR 316L
Application:Advanced Sub-2nm Semiconductor Wafer Steppers
Lead Time:7 – 9 Weeks
High-Pressure Blind & Weld-Neck Forged Flange
Flanges & Heavy Piping
Tol: ASME B16.5 / B16.47 Standard

High-Pressure Blind & Weld-Neck Forged Flange

Heavy ASME Class 2500 forged weld-neck flange with serrated gasket finish for critical pipeline and nuclear power joints.

Material:ASTM A105 / ASTM A182 F316L / F51
Application:Power Plants, High-Pressure Gas Lines & LNG Storage
Lead Time:2 – 3 Weeks
Industrial Manufacturing Campus
MARKETS & APPLICATIONS

INDUSTRIES WE SERVE

Precision components and heavy assemblies engineered to meet rigorous OEM quality standards across critical global sectors.

Automotive & High-Performance EV
Sector 01

Automotive & High-Performance EV

High-torque traction rotor shafts, suspension knuckles, and lightweight structural castings for OEM and EV platforms.

Key Parts:EV Rotor Cores
Core Process:5-Axis CNC
Energy, Oil & Power Generation
Sector 02

Energy, Oil & Power Generation

20,000 PSI subsea manifold blocks, forged weld-neck flanges, and supercritical nuclear power turbine blisks.

Key Parts:Subsea HPHT Blocks
Core Process:12
Construction & Heavy Mining
Sector 03

Construction & Heavy Mining

Hard-chromed hydraulic cylinder rods, heavy pin assemblies, and high-wear structural equipment brackets.

Key Parts:Hydraulic Piston Rods
Core Process:CNC Turning
Agricultural Equipment
Sector 04

Agricultural Equipment

Shock-resistant combine harvester drive shafts, splined hubs, and heavy disc hub assemblies for farm machinery.

Key Parts:Harvester Spindles
Core Process:Spline Milling
Heavy Engineering & Machinery
Sector 05

Heavy Engineering & Machinery

Heavy gearboxes, planetary gear sets, machine frames, and custom OEM turnkey cast enclosures.

Key Parts:Ground Gear Sets
Core Process:Gear Hobbing
Infrastructure & Rail Systems
Sector 06

Infrastructure & Rail Systems

High-strength structural brackets, railway bogie components, and high-integrity welded assemblies.

Key Parts:Mounting Brackets
Core Process:Fiber Laser Cutting
Active Industrial Factory Floor
OUR FACILITY • BUILT FOR INDUSTRIAL SCALE

ADVANCED MANUFACTURING FACILITY

Over 120,000 sq. ft. of climate-controlled machine shops, automated robotic fabrication lines, and Class 10,000 metrology suites.

48+
5-Axis CNC Centers
DMG Mori & Hermle
16+
Robotic Automation Cells
KUKA 7-axis robotics
120K+
Sq. Ft. Manufacturing
Climate-controlled bays
2.4M+
Annual Parts Output
99.85% spindle uptime
5-Axis Machining Bays
ZONE A

5-Axis Machining Bays

Climate-stabilized vaults at 20.0°C ± 0.1°C with linear direct drives and active thermal drift compensation.

Active Live Operation
12,000T Forging & Ring Mill
ZONE B

12,000T Forging & Ring Mill

Isothermal closed-die hydraulic presses and radial-axial seamless ring rolling up to Ø 6.5 meters.

Active Live Operation
Robotic Welding & Assembly
ZONE C

Robotic Welding & Assembly

Synchronized robotic TIG, laser-hybrid, and friction stir welding lines with automated laser seam tracking.

Active Live Operation
Class 10,000 Zeiss Metrology
ZONE D

Class 10,000 Zeiss Metrology

Zeiss Xenos sub-micron tactile CMMs, GOM optical 3D scanners, and computerized tomography void testing.

Active Live Operation
08. METALLURGICAL SCIENCE & DIGITAL TWIN LAB

COMPUTATIONAL SIMULATION &
EXOTIC ALLOY SPECTROSCOPY

Predicting stress concentrations, thermal distortion, and grain boundary evolution through advanced physics modeling before cutting a single millimeter of alloy.

FEA & Kinematic G-Code Simulation

Every CNC toolpath is validated inside machine-specific digital twin environments to eliminate chatter, optimize tool engagement angles, and prevent deflection under heavy cutting forces.

36-Element Optical Emission Spectrometry

Raw ingots are chemically verified against ASTM & AMS specifications before lot release. Trace amounts of harmful interstitial elements (H, O, N) are strictly quantified.

2,000 Bar Hot Isostatic Pressing (HIP)

Consolidating internal micro-porosity in additive and cast blanks through simultaneous high-temperature argon gas pressurization, achieving 99.98% theoretical density.

Interactive Metallurgy Specification Matrix

Exotic Alloy Performance Benchmarks

Nickel Superalloy

Inconel 718 (AMS 5663)

Yield Strength1,100 MPa at 650°C
Operating Limit700°C continuous
Hardness44 – 47 HRC
Density8.19 g/cm³
Primary Applications:Turbofan stator rings, rocket propulsion injectors, gas turbine blisks
Machining & Toolpath Strategy:Severe work-hardening; requires high-pressure 140 bar cryogenic coolant and trochoidal milling
Metallurgical Digital Twin CAD Model
OES Verification Lab: Lot 2026-NX-718 Verified 100% Ingot Conformity
OUR QUALITY STANDARDS • QUALITY AT EVERY STAGE

UNCOMPROMISING QUALITY CONTROL

Zero-defect manufacturing guaranteed through 3-stage closed-loop quality validation and sub-micron Zeiss metrology suites.

Incoming Material Verification
STAGE 01

Incoming Material Verification

100% Optical Emission Spectrometry (OES) chemical verification and ultrasonic flaw detection on all raw billets.

In-Process CNC Probing
STAGE 02

In-Process CNC Probing

Renishaw automated optical workpiece and tool probes calibrate zero-offsets every 30 minutes during metal cutting.

Final CMM & NDT Inspection
STAGE 03

Final CMM & NDT Inspection

Class 10,000 Zeiss tactile CMM and volumetric CT scanning generate 100% First Article Inspection Reports (FAIR).

GLOBAL QUALITY ACCREDITATIONS & CONFORMITY

AS9100 Rev D
Aerospace Quality Management System
ISO 9001:2015
Global Quality Management Standard
Nadcap NDT & Heat Treating
Materials Testing & Metallurgy
IATF 16949:2016
Automotive OEM Quality Standard
API Spec 6A & 17D
Subsea & Wellhead Equipment
ASME Section III
Nuclear Pressure Vessel N-Stamp
10. GLOBAL ADVANCED MANUFACTURING & DISTRIBUTION GRID

6 STRATEGIC HUBS ACROSS
EUROPE, NORTH AMERICA & ASIA-PACIFIC

Positioned adjacent to major deepwater ports and international air freight hubs to guarantee rapid dispatch of mission-critical assemblies.

HUB STATUS: OPERATIONALCoordinates: 47.3769° N, 8.5417° E

Zurich, Switzerland

Global HQ & Advanced Metallurgy Lab

High-temperature nickel superalloys, sub-micron metrology standards & executive engineering.

Facility Footprint65,000 m²
Workforce380+ Techs
Port Freight Window24 Hours
Accreditations Maintained at This Node:
AS9100 Rev DISO 9001:2015Nadcap Metallurgy
zurich.hub@aurex-industries.com
24 Hours to Frankfurt / Rotterdam
Synchronized Inter-Facility Logistics
Automated customs pre-clearance and multi-modal temperature/vibration-controlled transport corridors.
WEST (HOUSTON)CENTRAL (ZURICH / STUTTGART / BILBAO)EAST (NAGOYA / SG)
ZURICH
AIR CARGO / SEA LANES ACTIVE
Priority Expedited: 48h GlobalZero Freight Loss Guarantee
11. VALIDATED OEM CASE STUDIES

ENGINEERING CASE STUDIES:
MEASURABLE GAINS IN HIGH-STRESS PERFORMANCE

Quantifiable performance breakthroughs achieved for Tier-1 aerospace engine OEMs, deepwater energy operators, and sub-2nm semiconductor toolmakers.

Tier-1 Commercial Aerospace Engine OEM

Next-Generation Turbofan Stator Ring Consolidation

⚠️ Engineering Challenge:

Previous 3-piece bolted stator ring assembly suffered from micro-fretting wear, requiring teardowns every 1,800 flight hours.

⚡ Aurex Monolithic Solution:

Redesigned as a single-piece monolithic Inconel 718 forging, machined on 5-axis portal centers with custom trochoidal toolpaths.

Weight Reduction
-34.2%
Operating Hours
4,200 hrs
Part Count
3 → 1 Monolith
Cycle Time
-48%
Material: Inconel 718 (AMS 5663 / VIM-VAR) | Volume: 480 Units / Annual Production
Next-Generation Turbofan Stator Ring Consolidation
Production Validation
Next-Generation Turbofan Stator Ring Consolidation
100% In-Situ Metrology & FAIR AS9102 Approved
12. CIRCULAR METALLURGY & NET-ZERO OPERATIONS

CLOSED-LOOP SUSTAINABILITY &
ZERO-LANDFILL HEAVY ENGINEERING

Pioneering industrial circularity through 94.8% aerospace titanium swarf reclamation, solar microgrid integration, and closed-circuit coolant recycling.

94.8%

Alloy Swarf Reclamation

All titanium, nickel, and maraging steel chips from 5-axis milling are briquetted, vacuum-degreased, and remelted via Vacuum Arc Remelting (VAR).

99.2%

Coolant Distillation & Reuse

Closed-circuit vacuum evaporators purify synthetic machining emulsions, eliminating toxic industrial runoff and reducing virgin lubricant draw.

42 MW

Rooftop Solar Microgrid

Over 220,000 m² of photovoltaic roofing power our climate-controlled vault cooling and electric induction annealing furnaces.

NET-ZERO 2030

Scope 1 & 2 Roadmap

Transitioning high-temperature forging reheating furnaces to green hydrogen blends with comprehensive ISO 14001 environmental auditing.

Audited Environmental Transparency
ISO 14001:2015 & ISO 50001 Energy Management Certified

Every customer invoice includes audited Scope 3 embodied carbon calculations per kilogram of delivered finished part.

13. ENGINEERING SPECIFICATION & RFQ PORTAL

REQUEST A TECHNICAL QUOTATION &
CAD BLUEPRINT FEASIBILITY REVIEW

Submit your part parameters, GD&T requirements, and CAD models (.STEP, .IGES, .SLDPRT, .DXF). Our Zurich & Stuttgart engineering teams return certified DFM feedback within 24 hours.

1
2
3
4

Step 1: Select Primary Manufacturing Division & Sector

Choose the primary fabrication technology required for your component.

ITAR & NDA Compliant Portal